Here’s what it cost to build my three bedroom two bath house up to this point of the project the lane cost me thirty thousand dollars footing labor material was seventy five hundred then the block foundation labor and material was seventy three hundred moving on to the framing labor and material we had forty Five thousand dollars spent on that then the roofing labor and material came in at 62.50 then going on to plumbing rough in we had 6 100 there hvac ruffin was 7 500. electrical roughing was 7 000 and then the front and back door was 4 700 window package was 5200 with install Concrete slab and porches was 31.25 then hardy siding labor material was 16707 then going into the installation which was 60 10 right here stone veneer labor material was 93.49 and then the drywall was 81.32 and they did a phenomenal job up to this point so to this point of the House i have spent almost 170 000 but there’s still money to be spent Video Information
This video, titled ‘Cost to build my WOODEN 3 bedroom 2 bath house to this point of the project!! #building’, was uploaded by Niko’s Property Show on 2022-02-21 01:07:03. It has garnered 1650010 views and 71208 likes. The duration of the video is 00:00:55 or 55 seconds.